Quality Management: Inspect, Document, Ensure
Quality management in DDL is not a standalone tool, it is an integrated phase in the project planning workflow. After blending approval and cutting comes quality inspection, with full planning history, visual inspection of every individual part and PDF inspection reports for all project participants.
Qualitätsprüfung als Phase im Projektplanungs-Workflow
Von der Blending-Freigabe über den Zuschnitt bis zur Qualitätsprüfung, alles in einem integrierten Workflow.
Visual inspection of every individual part
Every part is inspected visually, whether already installed, laid out or currently being cut. The inspector sees the status and planning history of each piece.
Full planning history from the beginning
The inspector sees the complete project history from the start: blending approval, cutting specifications and planning decisions, all in one place.
Use during dryday, on the construction site or during cutting
Quality inspections happen where they are needed: during the trial layout (dryday), during installation inspection on the construction site or as a quality check before shipping.
PDF inspection reports for download
Inspection reports are generated as PDF and are available for all project participants to download and share.
Document quality standards per part
For every individual part, it is documented whether it meets quality standards. Deviations are captured and recorded transparently.
Integrated into the project planning workflow
Quality inspection is not a separate application, it is a phase in the project workflow, after blending approval and cutting, with full access to all planning data.
Quality inspection in the project planning workflow
Von der Blending-Freigabe bis zum PDF-Prüfbericht, Qualitätsprüfung als integrierte Phase.
Blending approval and cutting
In the project planning workflow, blending and cutting are completed first. All decisions and specifications are recorded in the planning history.
Start quality inspection
After cutting, quality inspection begins, during a dryday, on the construction site or directly during cutting. The inspector sees the full planning history from the beginning.
Visually inspect every individual part
Every part is inspected visually. Parts can be already installed, laid out or being cut. Quality status is documented per part.
Download and share PDF inspection report
The inspection report is generated as PDF and is available for all project participants to download and share.
Qualitätsprüfung im Detail
Visual inspection of every individual part
In the quality inspection, the inspector sees every individual part with its full planning history. Parts can be in different states: already installed, laid out or being cut. Each part is inspected visually and the quality status is documented.
- Jedes Einzelteil visuell prüfen mit vollständiger Planungshistorie
- Teile in verschiedenen Zuständen: verlegt, ausgelegt oder im Zuschnitt
- Qualitätsstandards pro Teil dokumentieren
Download and share inspection reports as PDF
Every inspection is generated as a PDF inspection report. It is available for all project participants to download and share, a professional quality record without separate document creation.
- Prüfberichte als PDF herunterladen und teilen
- PDF verfügbar für alle Projektbeteiligten
- Vollständiger Prüfverlauf jederzeit einsehbar
Use during dryday, on the construction site and during cutting
Quality inspections happen where they are needed: during the dryday (trial layout before installation), during installation inspection on the construction site or as a quality check during cutting before shipping.
- Dryday: Probeauslegung vor der Installation
- Baustelle: Montageprüfung bei der Installation
- Zuschnitt: Qualitätskontrolle vor dem Versand
Frequently asked questions about quality management with DDL
More solutions with DDL
Project Planning
Connect quality inspection with project planning for natural stone.
Warehouse Management
Combine material, locations and quality status in one system.
Digital Cutting
Connect quality inspection and cutting in the operational workflow.
Handheld Scanner App
Use quality inspection directly inside the mobile device workflow.
Start with DDL
See how quality inspection works as an integrated phase in the project planning workflow, with full planning history, visual inspection of every part and PDF reports.